Artec Environmental Addition and Renovation
Renovation of existing 3,400 SF 2 story space and 6,800 of building addition. Artec Environmental Monitoring approached Studio 3 Design about renovating the existing 3,400 SF space that was initially designed by studio 3 design in 2006 and design a new 6,800 SF addition to the building. The building additional uses a mixture of concreate block, EIFS and corrugated Metal siding to work together with the existing masonry building and blend it with its industrial surroundings.